1. HZS35 Stationary Concrete batching plant operator electromechanical responsible person shall be a day before the opening of guidance, inspection, supervision, the device driver "cross job." Particular attention to equipment belt correction, measurement of the pressure sensor clean.
2. HZS35 Stationary Concrete Batching Plant in case of continuous casting requires a large volume of water when the concrete components.
(1) failure-prone parts to maintain focus and ensure there is an appropriate accessory reserves;
(2) the supply department, asking them to provide reliable power to ensure;
(3) to maintain a standby generator in good technical condition;
(4) Maintenance and get ready to foot concrete transport vehicles (to achieve a slight surplus).
3. Stationary Concrete Batching Plant shall be equipped with two hydraulic pipes for use in concrete truck fails, the other will be driven by the use of concrete tank unloading. Appropriate alternate picks, timely removal of solidified concrete mixer truck concrete tank. Equipment maintenance, adjustment, maintenance, cleaning, turn off the main power switch, and hang up warning signs.
4. Concrete Batching Plant electrical control equipment and more high technology should be equipped with an experienced electrician, is responsible for the daily maintenance of electrical equipment.