Asphalt Mixing Plant-"Black Broken" Technology
With the rapid development of the large or medium city, the maintenance of urban road, the rise of urban construction, the demand for concrete mixing station and asphalt mixing plant is increasing. But in the large city, the maintenance cycle of pavement maintenance demand short time and can not affect the normal traffic.
Due to temperature limited, winter is usually in knocked off stage, but some large cities must be on the road maintenance, how to solve the problem that maintaining the road in a short time?
Hao Mei Machinery Co., Ltd. technical personnel adopts the international advanced "black broken" process in the right of the road maintenance, that is, the "asphalt stability," technology, which is popular to say that is to replace the original cement concrete with asphalt layer.
The original cement concrete is a rigid foundation, the construction need more than 20 days of the maintenance period, and will have more impacts on traffic. And the 'black broken' new technology, the maintenance time was shortened to 2 ~ 5 hours, stable layer of asphalt factory temperature of 200 degrees Celsius, pawnshops to the pavement temperature is falling rapidly. In order to prevent the cold road construction materials, joined the warm mix agent, at the same time, asphalt mixing plant also with the canvas on the road cold quilt. The use of black broken technology has completely solved the problem of the rapid maintenance of urban road surface, and will not affect the traffic.