DHB20 Drum Asphalt Mixing plant
I. Basal configuration of Asphalt Mixing plant:
1、The Specification of Single Hopper:
Bin Cubage | 3.5m3 |
The bin width | 2.6m |
Loading height | 2.3m |
2、The Specification of Titled belt feeding conveyer:
Belt width | 400mm |
Motor power | 3 kW |
Characteristics: Conveying belts will be equipped with tightening device, frequency conversion timing motor.
3、The Components and specification of Drying drum assembly(mobile)
1). Dryer drum:
Drum diameter | 1m |
Drum length | 4.5m |
Motor power | 5.5kW |
Driving type: gear and gear ring mesh driving;
2). Elevator:
①oblique, single row of chain;
②specification: motor power: 3 kW;
3). Drawing fan system: Motor power of drawing fan: 5.5 kW
4). Mixture storage silo:
Cubage | 2m3 |
Motor power | 2.2kW |
Mixture discharging height | 2.6 m |
Mixture storage silo upper part is equipped with material induction device; discharging outlet equipped with temperature sensor; the discharging door structure adopts hydraulic cylinder, hydraulic pump and so on;
Characteristics: The drying drum is driven by gear-tooth joggle with reliable capability;
4、Oil burning system
Noted: A China brand diesel oil burner; a set of oil pipelines and oil pump; The diesel oil tank will be equipped by client himself;
Rated Oil consumption | 130kg/h |
Drawing fan motor power | 3kw |
Oil pump motor power | 1.5kw |
5、Asphalt supply pipes:
The Components: an asphalt pump; matched asphalt pipes;
A diesel oil burner;
Frequency conversion timing asphalt pump power: 3kw;
Characteristics: Asphalt is heated by diesel oil with hot wind pipe enlaced in the pipe.
6、Electric control system
(1)Components: Electric operation platform and the cables from operation platform to the plant.
(2)Characteristics: In electric control system, it is equipped with operation platform, main electrical parts and China famous ZHENGTAI OR DELIXI product with interlock and two-grade protecting device; manual control device, main motor current display, finished mixture temperature display, frequency conversion timing for cold aggregate and asphalt is applied on operation platform; convenient and easy for operation.